Highways removes encroachments near Koyambedu to provide connectivity to storm-water drain 0 28.12.2022 19:42 The Hindu A row of shops, including those in existence for 20 years now, were pulled down for a length of 36 metres as they were encroachments and 5.5m wide land, measuring around 2,000 sq. ft. area, whose cost is estimated to be ₹5 crore was recovered Партнёры Smi24.net Все новости за 24 часа Музыкальные новости Агрегатор новостей 24СМИ