Another 90-km stretch doubled, electrified at a cost of Rs 636 Cr in South Central Railway zone 0 24.02.2023 14:39 Economictimes.indiatimes.com The South Central Railway (SCR) zone has completed the doubling and electrification works of 90-km stretch between Gooty and Dharmavaram at a cost of Rs 636 crore, resulting in decongesting and enhancing the connectivity to South Indian states. Партнёры Smi24.net Все новости за 24 часа Музыкальные новости Агрегатор новостей 24СМИ