Bengaluru-Chennai expressway likely to be ready by September 2024 0 13.05.2023 18:51 The Hindu About 12 km of asphalt surface has been formed in the ₹5,971-crore project; the NHAI says about 98% of the land required was readily available; the project is expected to completed by July 2024 Партнёры Smi24.net Все новости за 24 часа Музыкальные новости Агрегатор новостей 24СМИ