Since the 1,768 km BTC pipeline became operational in June 2006 till the end of June 2023, it carried a total of over 4.1 billion barrels (more than 546 million tonnes) of crude oil loaded on 5,402 tankers and sent to world markets. The 4 billion barrels of oil export milestone was achieved on 18 January 2023, bp Azerbaijan told AZERTAC