The airport’s 2.4 kilometres-long secondary runway, originally constructed as an air force base when Malta was under British Rule, has been resurfaced. Known as Runway 05-23, it is expected to be fully operational by the end of the week, with minor infrastructural works due in early January.Apart from general aviation aircraft and aviation training institutions,...