Добавить новость
smi24.net
News in English
Апрель
2024

South Africa needs 13 GW of gas-to-power capacity – more than the IRP envisions

0
Standard Bank head of Southern Africa’s oil and gas coverage Paul Eardley-Taylor has suggested that South Africa needs 13 GW of gas-to-power (GtP) capacity, rather than the 7.2 GW to 8.6 GW outlined in the draft Integrated Resource Plan 2023. Speaking at mine ventilation solutions developer Howden’s Technology Day, hosted at Mintek, in Johannesburg, on April 17, he explained that this calculation was made by considering the need to overcome Stage 6 or even Stage 7 loadshedding, when Stage 6 was being regularly achieved, as well as ensure a 15% reserve margin for winter peak demand.














Музыкальные новости






















СМИ24.net — правдивые новости, непрерывно 24/7 на русском языке с ежеминутным обновлением *