Delayed deadlines, inflated costs of the bullet train makes it a costly liability, alleges Opposition 0 21.05.2024 18:28 The Hindu With an annual outgoing EMI of ₹6,802 crore but a lower estimated revenue, the Mumbai-Ahmedabad bullet train project is set to become a big liability to the exchequer Партнёры Smi24.net Все новости за 24 часа Музыкальные новости Агрегатор новостей 24СМИ