Tunnel boring machines slow down to keep pace with station construction in Metro Rail’s phase II project 0 25.05.2024 16:58 The Hindu In three stretches—Ayanavaram to Otteri, Ayanavaram to Perambur and Chetpet to Sterling Road — the TBMs have already bored and are waiting near the station Партнёры Smi24.net Все новости за 24 часа Музыкальные новости Агрегатор новостей 24СМИ