Investigative Committee opens criminal case in fact of multimillion-dollar violations at High Voltage Electrical Networks CJSC
ArmInfo.With the consent of the Prime Minister of the Republic of Armenia, on the basis of an order from the head of the State Supervision Service of the Republic of Armenia, a study was conducted at the High Voltage Electrical Networks CJSC which revealed multimillion-dollar violations in the company.
According to the press service of the State Supervision Service, as a
result of the study, obvious violations and systemic problems were
recorded totaling about 10.7 billion drams, 2.6 million US dollars
and 10.6 million euros, as well as an increase in the cost of the
project in the amount of 146.0 million euros due to its untimely
non-implementation. In order to eliminate the abovementioned
violations, as well as systematically solve problems, the Ministry of
Territorial Administration and Infrastructure of the Republic of
Armenia, as an authorized body, has been presented with a proposal to
hold discussions with the Company and take measures to eliminate the
abovementioned violations and systematically solve problems, as well
as in the direction of restoring funds from the state budget of the
Republic of Armenia .
To give a legal assessment, the facts containing signs of an obvious
crime were transferred to the RA Prosecutor General's Office, which
submitted a report of the crime to the RA Investigative Committee. As
a result, on November 3 of this year, a criminal case was opened in
the Main Directorate for Investigation of Particularly Important
Cases of the Investigative Committee of the Republic of Armenia on
the grounds established by the relevant articles of the Criminal Code
of the Republic of Armenia.
In pursuance of the order N12 dated 20.01.1997, of Ministry of Energy
of RoA, proceeding from the improvement necessity in Energy System of
RoA, "High Voltage Electrical Networks" as a subsidiary company was
established in the structure of "Armenergo" State Enterprise on
30.06.1997.
Based on the decision N450 dated 20.07.1998 of the Government of RoA,
"High Voltage Electrical Networks" CJSC (HVEN CJSC) was established
on 21.08.1998 in a way of reorganization of subsidiary company as
"High Voltage Electrical Networks" CJSC. The main objects and goals
of HVEN CJSC are the transmission of energy via 220-110kV electrical
networks, existing in the balance of HVEN CJSC.