Eagle Nuclear launches enviro baseline study at Aurora uranium project
US-based Eagle Nuclear Energy has launched a full environmental baseline programme at its Aurora uranium project on the Oregon-Nevada border, ahead of a planned 27 000 ft drill campaign tied to a prefeasibility study (PFS).
The environmental baseline work will include hydrology, groundwater, wetlands, meteorology and cultural studies, to lay the groundwork for permitting and mine design as the company progresses a PFS.
